A document titled Appendix 24, Wreckfixed 2010, which is Part I of the International Wreck Removal Services Agreement. The form contains logos for BIMCO and the International Salvage Union. The page is a grid with 14 numbered boxes for details such as Place and Date of Agreement, Contractor, Company, Vessel Specifications, and Payment Details. Below the grid are paragraphs of text and signature boxes for the Contractor and the Company. A footer states this is a computer-generated form reproduced by permission of BIMCO.

Page 1102

A document page labeled Appendix 24 and Annex I, which is a schedule of personnel, craft and equipment for the International Wreck Removal and Marine Services Agreement. The agreement is specified as Fixed Price – No Cure, No Pay, with the code name WRECKFIXED 2010. The form provides fields for the date and vessel, followed by a large blank area for the schedule. A footer states the document is a computer-generated form printed by authority of BIMCO.

Page 1103

A document page from Appendix 24, Part I, which is Annex II, the Method of Work and Estimated Time Schedule. It is for the International Wreck Removal and Marine Services Agreement, subtitled Fixed Price, No Cure, No Pay, and has the code name WRECKFIXED 2010. The form provides fields for the date and vessel, with most of the page left blank for the schedule. The footer identifies it as a computer-generated WRECKHIRE 2010 form printed by authority of BIMCO.

Page 1104

A document page from Appendix 24, Part I, labeled Annex III, Contractor’s Daily Reports. It is a form for the International Wreck Removal and Marine Services Agreement, Fixed Price – No Cure, No Pay, code name Wreckfixed 2010. The form includes sections for date, report number, status of the wreck and site, and weather on location. It also has fields for services performed and planned, areas of concern like health and safety, comments, and signatures for the contractor’s and company’s representatives. The footer identifies it as a computer-generated Wreckhire 2010 form printed by authority of BIMCO.

Page 1105

A document page labeled Appendix 24, Part I, which contains a signature block. Rows are provided for the Company’s Representative and the Contractor’s Representative, with columns for their Name, Position, and Signature. Below the table is a heading for Contractor’s Daily Reports, followed by blank space. The footer identifies the document as a computer-generated WRECKHIRE 2010 form printed by authority of BIMCO.

Page 1106

A document page titled Appendix 24, Part II, of the Wreckfixed 2010 International Wreck Removal and Marine Services Agreement. The page contains four numbered sections outlining the agreement’s terms. The sections are titled 1. Definitions, 2. The Services, 3. Company Representative, and 4. Change of Method of Work and/or Personnel, Craft and Equipment. The text is line-numbered from 1 to 59 on the right margin.

Page 1107

A page from a legal document titled Appendix 24, Wreckfixed 2010, Part II. The page contains numbered sections of an agreement, with line numbers running down the right margin from 60 to 119. The main section headings are 5. Miscellaneous, 6. Permits, 7. Termination, and 8. Delivery and/or Disposal. Each section is further divided into lettered subsections detailing specific clauses of the agreement.

Page 1108

A document page from the Wreckfixed 2010 agreement, labeled Appendix 24, Part II. The page contains clauses from the International Wreck Removal and Marine Services Agreement. The sections detailed are clause 9, Payment; clause 10, Extra Costs; clause 11, Security; and clause 12, Liabilities. Each clause is broken down into multiple sub-clauses. Line numbers from 120 to 174 are listed in the right margin of the document.

Page 1109

A document page labeled Appendix 24, Part II of the WRECKFIXED 2010 International Wreck Removal and Marine Services Agreement. The page is line-numbered and contains several clauses, starting with a continuation of a previous clause, followed by clause 13, Himalaya Clause. Subsequent clauses are 14, Lien; 15, Time for Suit; 16, Expert Evaluation; and 17, Arbitration and Mediation. The clauses are further divided into sub-clauses detailing the terms of the agreement.

Page 1110

A document page from Appendix 24, Part II, of the WRECKFIXED 2010 agreement, titled International Wreck Removal and Marine Services Agreement. The page details clauses regarding dispute resolution, including different arbitration procedures for claims of varying amounts, such as the LMAA Small Claims and Intermediate Claims Procedures. Other clauses specify the governing law, with options for United States law or a mutually agreed place, and outline a process for mediation. The final section on the page is Clause 18, the Notices Clause. Line numbers from 236 to 291 are listed in the right margin.

Page 1111

A page from the WRECKFIXED 2010 International Wreck Removal and Marine Services Agreement, labeled Appendix 24 and Part II. The page is formatted in a single column with line numbers on the right. It details several clauses, starting with number 19, Insurance, and number 20, Pollution. It is followed by clause 21, Rotation and Replacement of Craft, Equipment and Personal, and clause 22, General Provisions. The General Provisions clause is further divided into sub-clauses covering topics such as severability, waiver, and warranty of authority.

The rest of this document is only available to i-law.com online subscribers.

If you are already a subscriber, click Log In button.

Copyright © 2026 Maritime Insights & Intelligence Limited. Maritime Insights & Intelligence Limited is registered in England and Wales with company number 13831625 and address 5th Floor, 10 St Bride Street, London, EC4A 4AD, United Kingdom. Lloyd's List Intelligence is a trading name of Maritime Insights & Intelligence Limited.

Lloyd's is the registered trademark of the Society Incorporated by the Lloyd's Act 1871 by the name of Lloyd's.