Delay and Disruption in Construction Contracts
| Delay and Disruption in Construction Contracts, 6th Edition, (c) 2025 |
Page 1271
Appendix 2
Types of documents
There are six basic types of records that should be maintained during a project:
| Delay and Disruption in Construction Contracts, 6th Edition, (c) 2025 |
There are six basic types of records that should be maintained during a project: