EUROCOM LTD v SIEMENS PLC

Adjudication – Request for nomination of adjudicator – RICS form – Identification of named adjudicators with conflicts – Possible fraudulent misrepresentation – Implied term not to subvert nomination process – Vitiation of adjudicator’s appointment – Overlap between decisions in two adjudication decisions.

[2015] BLR 1

NATS (SERVICES) LTD v GATWICK AIRPORT LTD DFS DEUTSCHE FLUGSICHERUNG GMBH (INTERESTED PARTY)

Public procurement – Implementation of European Directive 2007/66/EC – Automatic suspension of tender process or equivalent injunction already in place until trial – Pleadings – Amendment of pleadings – application to strike out – Principles applicable to tenders under EC Regulations and whether duty in relation to “abnormally low” tenders – Expedited trial due to issues – Lack of time prior to trial and effect of amendment.

[2015] BLR 19

RENDLESHAM ESTATES PLC AND OTHERS v BARR LTD

Defective Premises Act 1972 – Meaning of “dwelling”, “in connection with the provision of a dwelling” and “fitness for habitation” – Measure of damages in respect of common parts – Damages for blight – Damages for inconvenience and distress.

[2015] BLR 37

PT PERUSAHAAN GAS NEGARA (PERSERO) TBK v CRW JOINT OPERATION (INDONESIA)

Dispute adjudication board – FIDIC Red book – Binding nature of decision – Reviewable in arbitration – Enforceability of DAB decision – International Arbitration Act 2002 (Singapore) – Jurisdiction of arbitrators to issue interim award – Breach of natural justice rules.

[2015] BLR 119

SAVOYE AND SAVOYE LTD v SPICIERS LTD

Adjudication – Enforcement of adjudicator's decision – “Construction operations” – Housing Grants, Construction and Regeneration Act 1996, section 105 – [Fixtures] – “Form part of the land”.

[2015] BLR 151

IMTECH INVIRON LTD v LOPPINGDALE PLANT LTD

Adjudication – Adjudication clause in main contract – No adjudication clause expressed in subcontract – Incorporation of main contract terms – Analysis of what was incorporated – Suitability for summary judgment process – One dispute under one subcontract referred to adjudication.

[2015] BLR 183

ISG CONSTRUCTION LTD v SEEVIC COLLEGE

Adjudication – Jurisdiction – Entitlement to payment – Valuation of works – Payless notices – Recovery of monies overpaid.

[2015] BLR 233

GROUP M UK LTD v CABINET OFFICE

Public procurement – Removal statutory suspension – Remedies Directive No 2007/66/EC – Principles governing injunctive relief – So-called “American Cyanamid” and those governing suspension of contract award under – Public Contract Regulations 2006 (SI 2006 No 5) – Public interest.

[2015] BLR 258

ASPEN INSURANCE UK LTD v ADANA CONSTRUCTION LTD

Insurance – Combined contractors' liability policy – Public liability – Product liability – Meaning of product – Failure of work to perform intended function – Appropriateness of negative declaration is sought by insurers – Meaning of “superstructure” – Crane as “superstructure”.

[2015] BLR 273

PAICE AND ANOTHER v MJ HARDING (TRADING AS MJ HARDING CONTRACTORS)

Adjudication – Four adjudications – Same adjudicator for first, third and fourth – Telephone contact between claimants and adjudicator’s office – Apparent bias – Test for bias – Fair-minded and informed observer – Adjudicator’s explanations relevant matter in considering bias – Waiver of bias – Overlap between third and fourth decisions – Lack of jurisdiction in later adjudication.

[2015] BLR 345

HERON BROS LTD v CENTRAL BEDFORDSHIRE COUNCIL

Public Contracts Regulations 2006 (SI 2006 No 5) – Period for service of claim form – Service of unsealed claim form within statutory period – Application to strike out claim – Discretion to cure irregularity in service of unsealed claim form – Regulation 47F – Service of claim form in accordance with rules of court – Valid service achieved when step taken in accordance with CPR 7.5(1) within seven days of issue of claim form.

[2015] BLR 285

KHURANA AND ANOTHER v WEBSTER CONSTRUCTION LTD

Adjudication agreement – Binding decision – Access to the courts – Unfair Terms in Consumer Contracts (SI 1999 No 2083), regulations 5 and 7 – Application to stay the action – Principles.

[2015] BLR 396

ALLIANCE CONCRETE SINGAPORE PTE LTD v SATO KOGYO (S) PTE LTD

Contract – Frustration of contract – Unspecified source unavailable after contract formation – Whether parties contemplated the unspecified source – Whether parties discharged from further performance – Whether failure to supply sand prior to frustration amount to repudiatory breach.

[2015] BLR 410

MT HØJGAARD A/S v E.ON CLIMATE AND RENEWABLES UK ROBIN RIGG EAST LTD AND ANOTHER

Construction of a contract for the design and installation of wind turbines – Warranty of fitness for purpose – Whether provision requiring compliance with industry standard qualified obligation of fitness for purpose – Whether obligation to comply with contractual technical standard imposed a strict obligation – Meaning of 20-year design life.

[2015] BLR 431

SECRETARY OF STATE FOR DEFENCE v TURNER ESTATES SOLUTIONS LTD

Arbitration – Preliminary issues – Arbitration Act 1996, section 45 – Criteria for court ordering preliminary issues – Question law – Substantial effect on parties' rights – Substantial costs savings – Construction of contract – Canons of construction.

[2015] BLR 448

ILIFFE AND ANOTHER v FELTHAM CONSTRUCTION LTD AND OTHERS

Summary judgment – CPR Part 24.2 – No real prospect of success – Other compelling reason – Fire case – Joinder of third parties – Issues about causation – Third party pleadings not closed – Damages remaining to be assessed in any event.

[2015] BLR 544

WOODS BUILDING SERVICES v MILTON KEYNES COUNCIL

Procurement – Evaluation criteria – Duty of transparency – Duty of fairness and equal treatment – Undisclosed criteria – Manifest error – Role of unsuccessful tenderer's ex-employee in evaluation exercise by authority – Conflict of interest – Use by successful tenderer of competitor's confidential information taken unlawfully.

[2015] BLR 571

WOODS BUILDING SERVICES v MILTON KEYNES COUNCIL (NO 2)

Procurement – Authority in breach of duties of transparency, fairness and equal treatment – Remedy – Corrected evaluation score showed claimant out-scored successful tenderer – Whether court would order authority to contract with claimant – Damages.

[2015] BLR 591

PT PERUSAHAAN GAS NEGARA (PERSERO) TBK v CRW JOINT OPERATION (INDONESIA)

Adjudication – FIDIC Contract Red Book – Clause 20 – Dispute adjudication board – International Arbitration Act 2002 – Partial and interim awards – Provisional awards – Final awards – DAB decision given effect to – Final and binding nature of decisions ad awards – Impact of later Partial Award on merits – International Arbitration Act 2002, section 19B.

[2015] BLR 595

NH INTERNATIONAL (CARIBBEAN) LTD v NATIONAL INSURANCE PROPERTY DEVELOPMENT COMPANY LTD (NO 1) AND (NO 2)

FIDIC Contract for Construction 1999 1st Edition – Clause 2.4 Employer's financial arrangements made and maintained – Reasonable evidence to be provided – Termination by contractor for breach of clause 2.4 – Question of fact for arbitrator – Clause 2.5 Employer's rights to set off and cross-claim – Employer's notice and particulars as condition precedent.

[2015] BLR 667

PORTSMOUTH CITY COUNCIL v ENSIGN HIGHWAYS LTD

PFI contract – Highway network – Service points for defaults by contractor – Good faith – Expressed and implied – Contract interpretation – Limited scope of good faith duty – Best Value Duty.

[2015] BLR 675

HENIA INVESTMENTS LTD v BECK INTERIORS LTD

Part 8 proceedings – Interim Application for Payment – Interim Certificate – Pay Less Notice – Payment provisions – JCT Standard Building Contract without Quantities 2011 – Housing Grants, Construction and Regeneration Act 1996 (as amended).

[2015] BLR 704

THE CENTRAL TENDER BOARD v VERNON WHITE (TRADING AS WHITE CONSTRUCTION SERVICES)

Tender – Public body – Finance (Administration) Act 2008 (Montserrat), section 57 – Procurement and Stores Regulations – Ultra vires – Tender accepted – Time for completion not expressed in tender – Implied contract between tenderers and employer – Duty to act fairly in treatment of tenderers.

[2015] BLR 727

OPENVIEW SECURITY SOLUTIONS LTD v MERTON LONDON BOROUGH COUNCIL

Regulations 47A, C, G to L – Public Contracts Regulations 2006 (as amended) (SI 2006 No 5) – Automatic suspension where alleged breach by contracting authority to economic operator – Application to set aside automatic suspension – Whether damages an adequate remedy.

[2015] BLR 735

WYCOMBE DEMOLITION LTD v TOPEVENT LTD

Adjudication enforcement – CPR Part 24 – Reference of multiple disputes – Breaches of natural justice – Adjudicator refusing to make visit to site – Adjudicating deciding valuation basis on alternative methodology without opportunity to comment.

[2015] BLR 765

SSE GENERATION LTD v HOCHTIEF SOLUTIONS AG AND ANOTHER

NEC Contract (2nd Edition) – Indemnity provisions – Insurance provisions – Interrelationship of such provisions – No presumption that insurance provisions had primacy – No implied term that one co-assured could not sue another.

[2015] BLR 774